PLANEUS SOFTWARE

Langcroft Consultancy are the UK partner for planeus. We provide sales support, implementation & technical support

Langcroft Consultancy are the sole UK Partner for planeus, the unique and  powerful cloud based graphical planning and scheduling system.

Just some of planeus’ powerful features:

  • Connect to existing ERP systems to create Gantt chart plans
  • Has factory routing with resource feedback to give real time (start / interruption / completion) updates back to the manufacturing plan
  • It will even report yield, waste and length of operational running time
  • Get rid of mind-boggling Excel spreadsheets and decades old software
  • Visualise your manufacturing processes, optimise production plans and adapt to situations in real time
     

NOW THAT’S POWERFUL!

Production scheduling software

planeus - Your Production Scheduling Software of Tomorrow...

Real-Time Planning at Your Fingertips -
watch the video

planeus works seamlessly across desktop, tablet, and mobile – putting live data and schedule visibility in your hands wherever you are.

Perfect production scheduling software for manufacturers who need agile, flexible, and cloud-based planning.

planeus delivers measurable results…

⬆ 50% More on-time deliveries

⬆ 30% Faster production

⬆ 30% Shorter lead times

⬆ Significant reductions in paper use

⬆ Improved collaborations across multiple sites

Production scheduling software

Digital Project Gantt Chart

Powerful Digital Gantt Charts for Project Planning.

Build, visualise and track every step of your manufacturing process with drag-and-drop Gantt charts. See the full project lifecycle from sourcing to production, all in one place.

Project Gantt chart software, production planning tools, drag-and-drop scheduler.

Digital Manufacturing Gantt Chart

Dynamic Gantt Charts for Manufacturing Operations

Stay in control of your shop floor with real-time manufacturing Gantt charts.

Track scheduled delivery dates, task conflicts, and production bottlenecks –
and adjust plans with ease.

Digital manufacturing planning, visual scheduling, factory Gantt chart software

Production scheduling software
Production scheduling software

Connected Shop Floor Data

Live Shop Floor Data Integration

Capture real-time performance data from every production step
– including yield, scrap rates, and cycle time.

planeus gives you full visibility into actual vs planned performance so you can make informed decisions fast.

Shop floor data collection, manufacturing analytics, real-time production feedback.

Data Import & Integration

Seamless Data Integration – Manual or Automated.

Easily import planning data from Excel, CSV, or through custom API integrations. planeus connects to your ERP or other systems to streamline workflows and eliminate double data entry.

ERP integration, automated planning imports, CSV Excel schedule uploads.

Production scheduling software

Industry Fit Statement

Flexible for Any Manufacturing Industry

Whether you’re in plastics, electronics, furniture, or window manufacturing, planeus adapts to your needs.
Gain better control, improve productivity, and boost operational efficiency – no matter your sector.